High Voltage Shut-off Procedures |
|
High voltage components: High Voltage Battery Pack Assembly, Power Relay Assembly (PRA), BMS ECU, Hybrid Power Control Unit (HPCU), Hybrid Drive Motor, HSG, Electric A/C Compressor, Low DC/DC Converter (LDC), Power Cable, Electric Compressor etc. |
1. |
Turn the ignition switch OFF and disconnect the auxiliary 12V battery negative (-) terminal. |
2. |
Remove the safety plug cover (A) under the rear seat..
|
3. |
Unfasten the hook (A) in the direction of arrow.
|
4. |
Unfasten the lever (A) in the direction of arrow.
|
5. |
Remove the safety plug (A).
|
6. |
Wait at least 5 minutes or until the capacitor in the high voltage system is fully discharged. |
7. |
Measure the voltage between the inverter terminals to check that the capacitor in the inverter is discharged completely.
|
Kia Niro 2017 (DE HEV) Service Manual: Front Door Side Weatherstrip Repair procedures
Replacement
1.
Loosen the front door checker (A) mounting bolt.
Tightening torque :
19.6 - 29.4 N·m (2.0 - 3.0 kgf·m,14.5 - 21.7 lb·ft)
2.
Detach the clips, and then remove the front door side ...
Kia Niro 2017 (DE HEV) Service Manual: Pressure Source Unit Components and components location
Components
1. Pressure Source Unit (PSU)
2. Motor
3. Filler adapter
4. Accumulator
5. Bracket
...