High Voltage Shut-off Procedures |
|
High voltage components: High Voltage Battery Pack Assembly, Power Relay Assembly (PRA), BMS ECU, Hybrid Power Control Unit (HPCU), Hybrid Drive Motor, HSG, Electric A/C Compressor, Low DC/DC Converter (LDC), Power Cable, Electric Compressor etc. |
1. |
Switch "OFF" the ignition and disconnect the negative (-) terminal of the auxiliary 12V battery. |
2. |
Remove the safety plug cover (A) under the rear seat..
|
3. |
Unfasten the hook (A) in the direction of arrow.
|
4. |
Unfasten the lever (A) in the direction of arrow.
|
5. |
Remove the safety plug (A).
|
6. |
Wait at least 5 minutes or until the capacitor in the high voltage system is fully discharged. |
7. |
Measure the voltage between the inverter terminals to check that the capacitor in the inverter is discharged completely.
|
Kia Niro 2017 (DE HEV) Service Manual: Components and components location
Components
1. LDWS ON/OFF switch
2. Instrument cluster
3. LDWS unit (MFC)
? MFC : Multi Function Camera
–
Function : LDWS, HBA, SLIF, AEB, SCC
...
Kia Niro 2017 (DE HEV) Service Manual: Hybrid Drive Motor Assembly Repair procedures
Inspection
1.
Inspect the resistance line to line using mΩ tester.
Item
Inspection area
Specification
Remarks
Phase-to-phase resistance
Pins U - ...