High Voltage Shut-off Procedures |
|
High voltage components: High Voltage Battery Pack Assembly, Power Relay Assembly (PRA), BMS ECU, Hybrid Power Control Unit (HPCU), Hybrid Drive Motor, HSG, Electric A/C Compressor, Low DC/DC Converter (LDC), Power Cable, Electric Compressor etc. |
1. |
Switch "OFF" the ignition and disconnect the negative (-) terminal of the auxiliary 12V battery. |
2. |
Remove the safety plug cover (A) under the rear seat.
|
3. |
Unfasten the hook (A) in the direction of arrow.
|
4. |
Unfasten the lever (A) in the direction of arrow.
|
5. |
Remove the safety plug (A).
|
6. |
Wait at least 5 minutes or until the capacitor in the high voltage system is fully discharged. |
7. |
Measure the voltage between the inverter terminals to check that the capacitor in the inverter is discharged completely.
|
Kia Niro 2017 (DE HEV) Service Manual: Front Door Outside Handle Components and components location
Component Location
1. Front door outside handle
...
Kia Niro (DE HEV) Owners Manual: Heated steering wheel
With the ignition switch in the ON position or engine start/stop button in the
ON position, pressing the heated steering wheel button warms the steering wheel.
The indicator on the button will illuminate.
To turn the heated steering wheel off, press the button once again. The indicator
on t ...